BARDIAL Phase 1-3, Drip Irrigation Project

The first two stages of the project were performed by “Plastro Gvat” (Later JDW and Rivulis). Third stage won by Netafim. BERMAD was involved from the design stage , up to the  supply and commissioning including sending skilled technicians to help with installation and commissioning stages along the years.

Khayelitsha

3 units of PRV’s operating with 1 pilot as a single unit

Mitchells Plain

4 units of 12″ PRV and 1 unit of 8″ PRV

Cerro de la Estrella

Remplacent of old check valve 24”, and wáter hammer protection

Pasco County

Pressure Reducing & Sustaining with Insertion Flow Meter

Akko

720 16″