CCRR Callen is a 1.872 Ha irrigation consortium with 70 users who grow corn, barley, wheat and alfalfa. The consortium wanted to modernize its irrigation infrastructure because it was outdated, inefficient and required intensive manual operation (the previous system was based on ditches and open channels).
The project was designed to be fully automated and optimize the use of water. This would ensure a constant supply of water everywhere inside the consortium and allow users to irrigate whenever they need. This also included the implementation of advanced irrigation techniques to optimize production.
BERMAD supplied equipment to help achieve the following goals:
BERMAD implemented an integrated irrigation management solution with the following:
The role of BERMAD was to install pressure reducing and flow control hydrometers to ensure efficient irrigation control on each plot depending on the type of irrigation system (mainly sprinklers); to install combination air valves along the networks to ensure perfect control of the air inside; and to install a surge anticipating valve to protect the system against a sudden electrical failure in the pumping station that may create a damaging water hammer in the system.
The consortium’s new system is now fully automated and optimizes the use of water. It ensures a constant supply of water and allows for the implementation of advanced irrigation techniques, real-time monitoring and 24/7 operation.