Published:
Updated on:
Client: Kadesh Barnea Village, South Israel
Crop: Jojoba Plantation (100 acres)
Project: Drip irrigation
Project Description
- Maximizing use of salty water for irrigation, applying mixing junctions between fresh and salty water sources
- Monitoring and control irrigation, optimizing water and fertigation usage
Featured Products
- 8″ 718 doubled chambered, PLC electronic controlled
- 8″ TurboBar Woltman Flow Meter
- 73Q quick relief valves
- 730 pressure sustaining valve circulates buster pumps excessive pressure / flow
- 4″ solenoid remote control hydrometer
- 3″ polymeric pressure reducing valves with solenoid control