Did You Update BERMAD Connect Already? Check It Out

Update BERMAD Connect Today! Check It Out

global

Agricultural Districts – 24/7 Monitoring From Remote Sites

  • Irrigation
  • 2021
  • Israel
The challenge

24/7 Monitoring Without Power Supply

Regulatory in Israel mandates all agricultural districts to install high accuracy meters (preferred non-moving parts meters) with cellular connectivity to the national water authority (“Rashut-A-Maim”). The main challenge districts struggle with – is monitoring those sites 24/7 (live streaming) without the availability of a constant AC power supply.

24/7 Monitoring Without Power Supply
Solution

Smart Metering

To overcome this challenge BERMAD installs its electromagnetic flow meters MUT2200 With MC406 convertor powered by internal battery pack and a dedicated tailored made solar panel solution (3W), allowing for 24/7 constant Modbus communication from the smart meters to the national water authority’s communication device.

 

 

Main Benefits

Seamless, real-time monitoring.

  • Automated adjustments Automated adjustments
  • Real-time data visibility Real-time data visibility
  • 24/7 remote access 24/7 remote access
  • Reduced labor costs Reduced labor costs
  • Efficient water management Efficient water management
  • Quick issue resolution Quick issue resolution

Products in Use

Contact Us
Contact Us