Hai già aggiornato BERMAD Connect? Scopri di più

Hai già aggiornato BERMAD Connect? Scopri di più

Guide pratiche

Scopri come installare le flange divise sul misuratore di portata elettromagnetico BERMAD M10 (modello con estremità scanalate)

Irrigazione
Acquedotti

In this short installation guide, we walk through the correct process for mounting split flange adapters on a 4″ M10 flow meter. The video demonstrates how to position the rubber gasket, align the flange adapter with the grooved connection, and secure the assembly using standard tools. This step-by-step overview helps ensure proper installation, reliable sealing, and correct preparation of the flow meter before integrating it into your pipeline.

In this video:

  • Installing split flanges on a grooved-end M10 electromagnetic flow meter
  • Correct gasket orientation and positioning
  • Aligning the flange adapter with the roll-grooved connection
  • Tightening the assembly using standard tools (18 mm socket and spanner)

The procedure shown prepares the meter for final installation into the pipeline system.

For more info about the M10 EFM visit: https://www.bermad.com/product/m10/

For more info about the MUT7000 EFM visit: https://www.bermad.com/product/mut7000/

Note: The installation method shown in this video is also applicable to the MUT7000 electromagnetic flow meter when supplied with grooved-end connections and split flange adapters.

YouTube

Ultimi post

Hai bisogno di maggiori dettagli?

Hai una domanda? Siamo qui per aiutarti