East African Crude Oil Pipeline (EACOP) Project

Fire Protection Engineer
  • Fire Protection
  • 2024
  • Africa
Background

Protecting A Critical Energy Corridor

Have you heard about the world’s longest, heated crude oil pipeline? Developed through a collaborative effort between: Tanzania Petroleum Development Corporation (TPDC), TotalEnergies, and China National Offshore Oil Corporation (CNOOC), the groundbreaking project of EACOP (stands for: East African Crude Oil Pipeline) is designed to facilitate the transportation of produced oil from Uganda’s Lake Albert oilfields to the port of Tanga in Tanzania, from which it will be distributed worldwide.

The 24″ oil export pipeline is buried and covered with topsoil and vegetation to ensure safe crossing for people and animals. it spans 1,443 km from Kabaale, Hoima district in Uganda to the Chongoleani Peninsula near Tanga Port in Tanzania.

Protecting A Critical Energy Corridor
Protecting Complex Pipeline Infrastructure
The Challenge

Protecting Complex Pipeline Infrastructure

With a design capacity of 246,000 b/d, the pipeline is electrically heated to maintain a temperature above 50 degrees, A temperature that facilitates the flow of crude oil by reducing its viscosity.

 

An operation such as this consists of the following:

  • 6 pumping stations
  • 2 pressure reduction stations
  • Power generating station and terminal
  • Power distribution network and telecom (control & communication)
  • Heating facilities
  • Marine storage and export terminal
  • Load-out facility (in Tanzania)

The Solution

BERMAD Deluge And Pressure Control

As for what BERMAD provided to this project:

49 units of 400Y Electric Pressure Control Deluge valves – Specially designed for advanced fire protection systems that comply with the industry’s latest standards. Opening and closing of these valves may be controlled remotely utilizing electric components to suit the hazardous environment.

3 units of 43T Pressure Relief valves – elastomeric, pilot-operated valves that prevent damage from over-pressure in the pipeline and maintain a preset upstream pressure limit regardless of pressure peaks and fluctuating conditions.

and 34 units of 60F fire-line basket strainers mounted on skids, to prevent the clogging of fire sprinkler nozzles and other debris-sensitive components in water or foam fire systems.

Having a significant role in this project is deeply meaningful to us, as we work with our esteemed distributor, Deluge Offshore & Marine Pte Ltd, in Singapore.

TotalEnergies France and Worley UK Joint inspection in Singapore.

If you would like to discuss fire protection system design with our experts, you can schedule a free consultation. click here to contact our Fire Protection experts.

Main Benefits

Reliable Protection Across Critical Infrastructure

  • Hazardous-Area Operation Hazardous-Area Operation
  • Remote Valve Control Remote Valve Control
  • Over-Pressure Protection Over-Pressure Protection
  • Reliable Pressure Control Reliable Pressure Control
  • Debris Protection Debris Protection
  • System Reliability System Reliability

Products in Use

Explore our catalog of advanced water control products, designed to meet real-world demands
and deliver lasting performance.

Contact Us
Contact Us